Explore a selection of completed lifting, transport and heavy haulage projects delivered by the Terranova team.

Contract Lifting

Military Shooting Ranges

Scotland / Devon

Three high security sites. Two countries. Zero room for error. 3 sites completed 220te crane and a 250te crane deployed 0 incidents We were contracted to...

View case study
Contract Lifting

Digger placement in a confined courtyard

Surrey

Where there’s a will, there’s a way. 100t crane deployed 0° slewing during the lift Full CAD modelling before mobilisation Access was blocked on all sides...

View case study
Contract Lifting

Flagpole

Knightsbridge, London

Central London stops for no one. Except the owners of Harrods. 25m flagpole placed Full road closure coordinated Night works, ensuring zero disruption to trading We...

View case study
Contract Lifting

Steel Structure Installation

Surrey

Overdelivering comes as standard. 1 Huge steel structure erected 1 single crane setup position 1 Reduced programme A 20m x 40m steel structure needed erecting and...

View case study
Contract Lifting

Basement Panel Installation

The delivery vehicles couldn’t get in. So we found another way. 2 HIAB vehicles deployed 1 controlled road transhipment completed 0 delays to the programme Standard...

View case study
Contract Lifting

Internal Gantry Crane Installation

Brooklands, Surrey

Compliant, even in a global pandemic. Multiple cranes Specialist runners 0 Health & Safety breaches Installing gantry cranes inside an existing building is complex enough. How...

View case study
Contract Lifting

Spider Crane

Waterloo, London

With great lifting comes great responsibility. 1 specialist spider crane deployed Live railway boundary maintained throughout 0 encroachments onto the railway Working directly alongside a live...

View case study
Contract Lifting

Boiler House Radiator Removal

Wellingborough

30 tonnes of redundant radiator. No promblemo. 30 tonne unit removed 220 tonne crane 2 cranes coordinated simultaneously Removing a 30 tonne radiator from a boiler...

View case study
Contract Lifting

Structural Steel Installation

Central London

Steels in Central London? No problem. 60 tonne crane deployed 1 complete pre assembled steel structure installed Programme time significantly reduced A new coffee shop development...

View case study
Contract Lifting

Redundant Fuel Tank Removal

Minley Manor, Camberley

Old tank. Restricted site. Time to get it out of there. 2 cranes operated in tandem 1 redundant fuel tank extracted and loaded 0 disruption to...

View case study
Contract Lifting

Roof Structure Lift

Wokingham

Someone made a mistake, so this client called us in to fix it for them. 16 point lift completed 1 fully assembled roof structure repositioned 0...

View case study
Contract Lifting

Emergency Modular Installation

Waterloo, London

Emergency works needed for a large Central London practice. 1 full road closure coordinated Crane de-rigged and re-rigged every night 0 missed deadlines When emergency works...

View case study