Single track road. Soft ground. A bridge to install at the end of it.
- 1 bridge span installed
- Trackway laid to protect ground conditions
- 0 damage to the course
Getting a crane deep into a golf course isn’t straightforward. A single track access road and soft ground meant we needed to solve the access problem before the lift could even begin.
We installed the trackway in advance using our HIAB to protect the ground and get the crane where it needed to be. Once in position, a specialist rigging arrangement using modular beams, slings and specified shackles was used to lift and install the bridge span safely.