Our newest Demag AC45 was required in Somerset to install a large overhead crane into a building with a low ceiling. Normally cranes require a clearance height above a load’s final position for the boom and lifting tackle to occupy while the lift takes place. With our specially designed runner we can install our customers’ payloads a lot closer into a building’s roof space. Using this runner saves our customers’ money and time during the installation.



