Our newest Demag AC45 was required in Somerset to install a large overhead crane into a building with a low ceiling. Normally cranes require a clearance height above a load’s final position for the boom and lifting tackle to occupy while the lift takes place. With our specially designed runner we can install our customers’ payloads a lot closer into a building’s roof space. Using this runner saves our customers’ money and time during the installation.
You may also like
In the fight against the Covid-19 virus, Terranova Cranes has been helping the Wrightington Wigan and Leigh NHS Foundation Trust in the […]
A steel works client ordered a crane to lift some structural steel framing onto a building site at Thatcham, Berkshire. Our client […]
The largest City Class crane available in the UK, the Demag AC70 was used to assist in the installation of a 5G […]
In January, our light weight Jekko spider crane (at only 2395 kg) and operator, were hired by a landscaping service to lift […]